The gold junior with a fully permitted mill – Ready for gold production in 2026?

Looking for gold juniors with real assets and near-term production? In this exclusive interview, we speak with Kal Malhi, Chairman of LaFleur Minerals (CSE:LFLR)), about their flagship Swanson Gold Project and the fully-permitted Beacon Gold Mill in Val-d’Or, Québec → a setup that may position the company to enter gold production by early 2026.

Key highlights:

  • Fully-permitted and upgraded Beacon Mill (replacement cost +$71M plus 3-4 years)
  • Swanson deposit located on a mining lease, ready for extraction
  • Targeting 1M+ ounces through aggressive drilling
  • Plans to scale to a 100,000+ oz/year producer in Québec
  • Strategic M&A growth and potential toll milling revenue
  • Located in one of the best mining jurisdictions in the world

With ore sorting tech boosting grades and infrastructure already in place, Lafleur Minerals may be one of the most compelling near-term gold stories in the junior space.

For investors doing their due diligence on junior gold equities, this is a must-watch.

Join the discussion: Find out what everybody’s saying about this Canadian gold miner and near-term producer on the LaFleur Minerals Inc. Bullboard and check out the rest of Stockhouse’s stock forums and message boards.

This content is for informational purposes only and does not constitute financial, investment, or other professional advice. It should not be considered a recommendation to buy or sell any securities or financial instruments. All investments involve risk, including the potential loss of principal. Past performance is not indicative of future results. You should conduct your own research and consult with a qualified financial advisor before making any investment decisions.


Posted

in

,

by

Tags: